Sacred Heart Girls College Administration Upgrade, New Plymouth

Due to a growing roll and corresponding increase in Staff, a major upgrade was required. A new main entry was designed to focus the public interface of the school. Designed as a natural cedar clad entry funnel, the entry is flanked by a sacred cross icon. The previous entry was converted to administration space while a first floor staffroom and utility area were added, providing a link to the first floor circulation. By this means, the existing lift was utilised. The square forms tie in with the original school buildings but are finished in new materials.

Back to Projects